BG Property Group
PROPERTIES AND VEHICLES FOR SALE IN BULGARIA IN CRYPTOCURRENCY

RENOVATIONS
British Holiday home in village Bazovec

This is one incredibly basic renovation,which we did for our customers before one year.
Here,the renovation was expressed in ending works of this property.The good ideas of the owner for reconstruction and the offers from our side transformed this h...
Building on bathroom in holiday home in Peychinovo

Our colleagues from other company connected with us for building a bathroom of theirs customers.
For 7 days,we built a new bathroom for this customers,whose were bought this estate as holiday home.
The work included building of water main,casting o...
Old traditional house converted in to a nice holiday home

This is one improbable basic renovation,which we made by our customers before several months in one pretty village on river Lom.
Here,the renovation consisted in totally change of everything.
The good ideas of the proprietor for reconstruction and ...
Building on bathroom in haliday home in Lom Cherkovna

For 20 days,we built a new bathroom in old country house for our customers.They were bought this property as holiday home.
The work included building of water main,casting of concrete slab,hydroisolation of walls and ceilings with waterproof plastic...
Repairing on the fence in village Voditsa

The renovation here,that we made,it's not so big.We had to build just
part of shacked massive fence of house in village Voditsa.Our customer was an Englishman and he needed help for preservation his investment house in good repair.
We made the repa...


A young family bought this property before 2 years.They began with us
a renovation step by step.
We repaired the roof of basic house and we replaced the joinery with
PVC and imitation of wood.

We continued with repair and reconstruction of the...
Partly renovation in village Peychinovo

This house was repaired just partly,because our customers done the others ending activities.
We repaired the roof of the summer kitchen and we replaced the electrical network and water main.We moulded a concrete slab on the first floor.We covered wi...
Repairing on the roof in village Batishnitsa

In detail,here you can follow completely the replace of wooden construction on the roof.You can see the new roof too.
All roof-tiles are cleaned and ordered again.
The rich tiles was rendered and was put a new frontal boards.
...
Renovation on property in village near Nikopol

This is a partial renovation of country house around Nikopol.
We replaced the roof of the summer kitchen and we built a new electrical network and water main.
Inside,the walls are with plasticboard.
The renovation of house will continue.
...
British Holiday home in village Ostrica

We preset to our customers one country house in village Ostritsa,which renovation was made by our firm.
The house was ready only for four month.We started from the foundation to the roof.We built two toilets,3 bedrooms,kitchen with big dining-room,a...
Partly renovation in village Tsar Asen

At this stage of renovatoin,we can to traceable in detail the renovation of separated places of one house.We began again with the replace of electrical networks and water-mains in the estate.We have to build a new toilet on the two floors.
We const...
Total renovation on holiday home in village Svalenik

This old country house was bought from English family in 2007 year.
After the first visit in Bulgaria,they decided to make this place in second vacation house for them.The property wasn't in bad position.We made a view and after that,we found that i...
Total renovation of the second floor on the house near Centre .

This is a basic renovation on the floor of house,where we changed a woodwork,pavements,electrical installation and water-main.
We put a plasterboard on the walls and on the ceilings of the estate.
We repaired the sanitary rooms with a new terracott...
page from 2  prev | next









Roof repairs

When we repair the roof, we cover it piece by piece or the whole of it depending on whether the atmosphere conditions permit that to be done. The under-roof space is being cleaned up and then we begin the dismantlement of the broken and damaged wooden roof elements. Afterwards, the steel sheets around the chimneys are being replaced. The fixing of the front boards and the gutter pipes follow. Only when is the roof covered with water-resistant OSB and an upper layer of black paper, then it may be covered with tiles. The water-proof wooden construction of the new roof is ready and prepared for the arrangement of the whole tiles /the new ones/. The next stage is fixing of the trap-doors and their plastering, as well as chimney plastering. The newly-repaired roof is being edged with wooden edging in the underneath and is being varnished in a colour of client’s choice. This process takes 10-15 days / if weather permitting.

Replacement of water-supply and sewerage system

We start with dismantlement of the old installation and excavating of new channels for laying of the sewerage pipes. After that we put the new water-supply system made of PP pipes, bearing in mind the number of siphons and the location of the sanitary ceramics in the bathroom. After the system is made, it is filled with water and checked for possible leakage at the joints. The water-supply pipes are connected to the main and submitted to the client. The fitting of the sanitary ceramics and the mixing taps, as well as the bathroom or toilet accessories are not included in the price of the replacement of the water-supply and sewerage system. This is an issue of additional negotiations. We need about 2-4 days depending on the type of the old installation /metal pipes or stoneware/.

Electrical installation repairs

The installation is being checked out for eventual electrical leakages. Afterwards, the supply is cut and the old sockets and switches, as well as the old electric distribution boxes and fuses are replaced. It is decided with the client where to fix the new sockets, switches, the switchboard, the distribution circuits as well as whether and how many defect-protections will there be before wiring start. The selection and the types of the wirings used are controlled by the main technician - chief of the repairs. Wiring may be done in a couple of ways – dug into the wall, laid into PVC joints and freely hanging behind the plasterboard wall. This is compulsorily concerted with the client. Different types of electrical distribution boards and fuse boards are being fixed, depending on the concluding stage. After finishing the wiring, it is being checked together with the client or with an authorized by him person. The fitting of the lighting fixtures, the switches and the sockets are not included in the price of the wiring or its repairs. This type of activity is additionally negotiated with the client. That part of the repairs takes 10-15 days.

Replacement of the old window frames with new ones

The measures of the windows are taken for those of them which the client wants to replace. Price list for the different shapes of frames is made. If it is approved by the client, a deposit to the amount of min. 30 % of the offered price is required and within 7-10 days the new windows or doors are fixed. Once the work is done, the client pays the remaining part of the price. PVC frames have 5 year guarantee.

Outside thermal insulation

The putting of thermal insulation is very expensive home improvement which starts paying off on the very first day of its use. That’s why it should be done of high quality and using quality materials. The final layer can be put in two ways – after plastering to paint or to put silicone/mineral/ plaster with different colour. It should be kept in mind the outside temperature because it influences directly the materials which are used. There is the risk of freezing or cracking of the top working layer at very low or high temperatures. The quality putting of the final layer with glue or plastering mixture guarantees the client an excellent complete finish of the thermal insulation. Depending on the quantity of thermal insulation comes the term of its execution. If the area is about 100 – 140 sq.m., the time for putting the insulation at 20-25 ºC is 15-25 days.

Plasterboard

The putting of plasterboard at home is a quick and easy decision to decorate and straighten the outside walls and ceilings of home. A lot of and various types of decorations on the walls and ceilings can be made from it. The plasterboard is available in three kinds – for dry places, for damp places and fire-resistance places. Of course, the prices are different depending on board thickness. The laying of plasterboard has a few stages – construction, laying of wadding /if the client wishes/ and fine plastering of the surface with its preparation for the paint. Painting is not included in the price. The term of finishing a bedroom is 5-10 days.

Laying of flooring and walling

Decoration of the floors and sanitary rooms /toilet and bathroom/, as well as the joint parts of the house/flat and corridors and terraces are made entirely according to the client. The price can be cheap but it can be also expensive depending on the price of terracotta tiles or laminated flooring. The fitting is a very easy and quick process. The fitting of laminated flooring of a bedroom is done for a day. The terracotta and faience tiling in a normally big bathroom takes about 5 days. The accessory materials which are necessary for the laying of surfaces are chosen by the technician in charge of repairs.

Yard decoration

The yard decoration is the sole idea and decision of the client. If they wish, we can cooperate by only certain types of activities that are negotiated in advance.

Garbage dumping

The cleaning of the remaining materials, as well as the garbage found in the property is an important part of the repair works and more precisely a part from the final stage of repairs. It is often an activity very hard to be carried out because the dumps in the countryside are closed or there is no machinery for doing that. The organization of yard and property cleaning is a key element of submitting the repaired property for to the client.